We are going full blast with many outside Hazelnut Inn projects in order to finish them before winter sets in. These projects include the concrete sidewalks, curbs and driveway which will be paving stones. Henry and Juniper are eager to help as much as they can. With the gates now mounted and functional, the gate posts are being sculpted and painted. Henry gave us a helping hand.
23K gold!
The replacement sign section for our sign out front of our property is almost finished. Becke applied the genuine 23K gold leaf on Friday. We let the size harden up over the weekend and there are a few little touchups to make it ready to mount under the magic ship in the crescent moon. By mid-morning on Monday our sign should be whole once again and looking better than ever!
Instant dragon!
It was a monstrous task but the crew worked together to sculpt the dragon in only one (long) day. He sits on a short tower section that will be set on top of a ten-foot-tall tower that is already finished. This dragon is going to be pretty spectacular when it is installed!